-
2019 09
Obtained patent for Hybrid condensing boiler and 3 other cases
-
2018 07
Obtained patent for ultra low Nox water tube boiler and 1other case
-
2017 01
Production of water tube high pressure boiler (60t/h, 72Kg/㎠g)
-
2014 05
Construction Certificate - Machinery construction established.
-
2013 10
Obtained ASME Certificate and stamp
(“S”,“H”,“U”,“PP” stamp, certified by ASME in U.S.A )
-
2013 07
Obtained High-efficiency energy equipment certification
(Industrial boilers 1T/H~10T/H).
-
2012 09
Construction Certificate
- Heating construction(One kind) established.
-
2012 08
Obtained ISO 9001 / 14001 certificate ( KPC-QA ).
-
2012 04
Construction of Inju Industrial Parks Factory ( 3,300 ft ).