Product
District Heating Boiler
Reducing energy and manufacturing cost because waste heat is used.
Characteristic
  •  ▣ EPC Contractor : Kolon Global Co., Ltd.
        - Sep, 2015 : Myeongji Distrct Heating Project of P.L.B  [Designed by KDHEC]
                              (34.4Gcal/Hr * 16kg/cm2.g * 120℃ - 2Units)




     ▣ Korea District Heating Corporation Yangsan branch office
    NOV,2017: (34Gcal/Hr * 10kg/ cm2.g)